Going Green

Many will have noticed the support post in the middle of our waiting room (certainly the male dogs have noticed it!). This was added to enable us to go green. On the west side (back side) of the clinic roof, 52 solar panels (photo below) have been installed to reduce our electrical needs and our carbon foot print. 

 During the summer of 2013, our project was the installation of a solar hot water heating system in the clinic.